ABOVEGROUND FUELING SYSTEM INSTALLATION
Cornerstone designed, permitted and installed completely aboveground gasoline fueling system while reconditioning the former tank for diesel usage.
Port Hueneme, CA
ABOVEGROUND FUELING SYSTEM INSTALLATION
Cornerstone designed, permitted and installed completely aboveground gasoline fueling system while reconditioning the former tank for diesel usage.
Port Hueneme, CA
UNDERGROUND STORAGE TANK REMOVAL
Design, permitting and removal of underground storage tank, including all soil sampling, reporting and closure documentation. Cornerstone also provided backfill, compaction report and repaving to complete the project.
Orange, CA
ABOVE GROUND STORAGE TANK
Cornerstone designed, permitted and installed a 10,000 gallon aboveground gasoline storage tank in compliance with all local, state and federal requirements. In addition we secured the required SCAQMD permits.
Santa Ana, CA
BAG-HOUSE RECYCLED MATERIAL HANDLING SYSTEM
Cornerstone assisted with the design and permitting of a specialized bag-house recycled material handling system.
Rancho Dominguez, CA
Test Stand
Cornerstone designed and construction managed the installation of a new space plane thrust system test stand.
Santa Clarita, CA
AEROSPACE CHEM MILL TANK REPAIR
Cornerstone designed, permitted and repaired the chem mill line for military aerospace client. Project was done on fast track.
El Mirage, CA
SEWER & WATER PIPELINE INSTALLATION
Cornerstone bid and won a sewer installation project with California State University at Los Angeles. The project involved meeting project specifications, working with the onsite construction manager and coordinating construction activities around an operating campus. The new sewer line serviced the new visitor’s center and administration building.
Los Angeles, CA
ABOVEGROUND WASH PAD & WASTEWATER OIL SEPARATOR
Cornerstone engineered, permitted and constructed an aboveground wash pad system capable of removing both solids and petroleum hydrocarbons from the washing of industrial concrete pumpers.
The project involved design, permitting with the Los Angeles County Sanitation District as well as construction of the pad, sump, piping and treatment unit system.
Anaheim, CA
COMPLETELY ABOVEGROUND GASOLINE HIGH VOLUME FUELING SYSTEM
Cornerstone contracted with Toyota Logistic Services to design and construct a high volume completely above ground gasoline fueling system.
Cornerstone coordinated with the City of Long Beach, Port of Long Beach, Long Beach Fire Department, SCAQMD, CARB and Toyota´s construction management team to complete a successful project.
The system fuels up to 3,000 vehicles per day.